Skip to main content

Licensed & insured Illinois general contractor · City of Chicago GC licence on file · Est. 2004

Mon–Fri 09:00–17:00 · Chicago & surrounding suburbs

Home / Residential / Bathroom Remodeling

Clearances · Fixtures · Full bathroom renovation

Bathroom Remodeling in Chicago

Bathrooms are small rooms governed by fixed dimensions. Most of what makes one comfortable or awkward is decided at framing, long before anyone picks tile.

Clearances

The dimensions decide the room

Toilet centerline to wall
18 inches minimum — Evanston
Door clear space, push side
12 inches
Door clear space, pull side
18 inches
Scope
Full bathroom renovation
Service area
Chicago & suburbs

Clearance rules are mandatory on commercial jobs and inspected there. In houses they are almost never followed, which is why a bathroom can be finished to a high standard and still be uncomfortable to stand in. We hold to them anyway, because most of those dimensions exist for a plain reason: they make the room work.

Requirements are not uniform across the area. Evanston’s plumbing inspectors require a minimum of eighteen inches from the toilet centerline to the wall. Codes shift from village to village here, and inspectors carry real authority over how the code is read, so establishing which requirement applies before the walls go up is a large part of getting a bathroom through inspection.

None of it adds cost while the walls are still open. It adds a great deal once they are closed and a toilet has to be fitted into a thirty-inch gap.

Where the building department accepts a contractor’s own wall layout, we draw it ourselves rather than sending you to pay for one. That is not a way around anything: where stamped drawings, permits or inspections are required for the scope, they are filed and booked exactly as they would be otherwise.

How the work runs

Planned before it is framed

The order of operations is what keeps a bathroom from being rebuilt twice.

  • Measure and set the layout

    Fixture positions and door swings are set against the clearances before framing, not after the plumber has arrived.

  • Permits and inspections

    Filed where the scope requires it. Each stage is signed off as it closes instead of everything being inspected at the end.

  • Licensed trades

    Plumbing, electrical and HVAC work is carried out by licensed subcontractors.

  • Finish and walkthrough

    Tile, fixtures and trim finish the room, then we walk it with you and work through a snag list.

Project plates

SLOT 02 — Bathroom, completedFinished bathroom, wide enough to show fixture spacing. Used on 3 pages.
SLOT 08 — Bathroom, FRAMING stageWalls open, showing fixture positions set out. Carries the clearance argument.
SLOT 11 — Bathroom, detailTile, vanity or fixture close-up.

Common questions

Before you request an estimate

Do I need an architect for a bathroom remodel?

It depends on the scope and on what the building department requires. Where a contractor’s own wall layout is accepted, we produce it. Where stamped drawings or permits are required, those are filed.

Can the toilet or bath be moved?

Yes. Relocating fixtures is part of a full bathroom renovation, along with the plumbing and permit work that follows from it.

Do you take on single-item replacements?

No. The work is focused on complete bathroom renovations rather than swapping one fixture.

Free Estimate

Get a bathroom estimate

Send the room dimensions, what is moving, and photos of the existing space. Measurements help most.

Service area
Chicago & surrounding suburbs
Hours
Mon–Fri 09:00–17:00
Typical response
One business day
Call 773-969-7777 Free Estimate